Looking for kitchen renovation in Cyprus? Describe the job and get free quotes from verified businesses in your district, with no obligation.
A kitchen renovation covers the work behind the units: water supply and waste, sockets and power for the oven and hob, extraction for the cooker hood, the splashback, the floor and the painting. The price depends mostly on whether the layout changes: moving the sink or the hob means moving pipes and cables, while keeping the same layout is much quicker. Many kitchen suppliers fit the units but not the building work, so make clear whether you are asking for the units, the building work or both. In your request, say how big the kitchen is, whether the layout stays the same, whether you already have the new units or need them supplied, and what is included (floor, tiling, electrics, plumbing).
The old units and appliances come out first, then any wall tiles and, if needed, the floor. The plumber and electrician move or add supply, waste, sockets and the dedicated lines for the oven and hob, following the final kitchen plan. Walls are patched, the floor is laid and the room is painted. The kitchen supplier then fits the units, worktop and appliances. The splashback goes on after the worktop, so its edge sits neatly on top.
Quartz is hard, stain-resistant and needs little care; granite and other natural stone are tough but should be sealed now and then. Laminate is the budget choice, though hot pans and water at the joints can damage it. Splashbacks in tiles, glass or the same material as the worktop are all easy to wipe. Floors should handle water and dropped objects, so porcelain tiles are a common choice. Order the worktop after the units are fitted, so it is measured exactly.
A hood that vents outside removes heat and steam far better than a recirculating model, which only filters the air. If an outside vent is possible, plan the duct before the walls are closed. Count the sockets you need on the worktop, and add a few spare ones. Lighting under the wall units makes work easier and safer. In a hot kitchen, think about ventilation and, if the room is open plan, where the air conditioning will reach.
Many problems come from the gap between the kitchen shop and the building work. Give the builder the supplier’s drawing with the exact positions of taps, waste, sockets and the hood, and check them on site before tiling. Agree who connects the sink and appliances and who disposes of the old kitchen. The quote should say whether floor, tiling, electrics and plumbing are included, and list any extra visits.
As a rough guide, prices start at about €3,000 and go up to €15,000 per kitchen. The real price depends on size, materials and the starting condition: businesses tell you after reading your request.
No: posting a job is free and does not commit you to anything. You decide whether, and to whom, to give the job.
Only businesses and tradespeople working in your district that we have checked before activating them on Handy360.
All of Cyprus: Nicosia, Limassol, Larnaca, Paphos and Famagusta districts.
A kitchen renovation covers the work behind the units: water supply and waste, sockets and power for the oven and hob, extraction for the cooker hood, the splashback, the floor and the painting.
The price depends mostly on whether the layout changes: moving the sink or the hob means moving pipes and cables, while keeping the same layout is much quicker. Many kitchen suppliers fit the units but not the building work, so make clear whether you are asking for the units, the building work or both.
In your request, say how big the kitchen is, whether the layout stays the same, whether you already have the new units or need them supplied, and what is included (floor, tiling, electrics, plumbing).
© 2026 Handy360 · Made by Ariall