Bathroom renovation: free quotes in Cyprus

Looking for bathroom renovation in Cyprus? Describe the job and get free quotes from verified businesses in your district, with no obligation.

The job

Redoing a bathroom almost always means removing the old tiles, checking the drains and plumbing, waterproofing, laying new floor and wall tiles, and fitting sanitaryware and taps. Two things move the price the most: replacing a bath with a shower tray (which touches the drains) and moving the toilet or basin from where they are today. A standard bathroom usually takes two to three weeks of work; if it is the only bathroom in the house, agree in advance how you will manage those days. Removing the rubble and touching up the paintwork are normally part of the job. In your request, give the size in square metres, whether you want a shower instead of the bath, whether the fittings stay where they are, and whether you have already chosen tiles and sanitaryware or want the business to suggest them.

What happens behind the tiles

Once the room is stripped back, the plumber renews supply and waste pipes and fits concealed valves and the frame for any wall-hung toilet. A screed is laid with a fall towards the drain where there is a level shower. Then a waterproofing membrane is applied over the floor and up the walls in the wet areas, with tape at corners and pipe entries. Tiles go on only when the membrane is fully dry. Sanitaryware, taps, the shower screen and the mirror come last.

Walk-in shower or tray

A walk-in shower without a step looks clean and is easier for older people, but it needs enough floor depth for the fall and a well-planned drain, often a linear one. A low shower tray is quicker to fit and forgives small errors. Large-format tiles mean fewer grout lines to clean, while small tiles grip better underfoot. Wall-hung toilets and basins make cleaning the floor easier and need a solid frame inside the wall.

Hard water and ventilation

Limescale marks glass, taps and shower heads quickly in hard water areas. A coating on the shower glass and a thermostatic mixer with anti-scale nozzles make daily cleaning easier. Choose taps with a long guarantee and spare parts that are easy to find. A bathroom without a window needs an extractor fan, ideally with a humidity sensor or timer, to stop mould on the ceiling, even in a dry climate.

Signs of a careful quote

A careful quote names the waterproofing product and where it is applied, states whether the floor is raised or lowered for the shower, and lists every piece of sanitaryware and every tap. It should say whether tiles are supplied or only laid, and at what size, because large tiles take longer to lay. Check that the extractor fan, electrical points, mirror and accessories are included or listed as extras, and ask for the guarantee period.

How it works

  1. Describe the bathroom renovation job: what needs doing, where and when.
  2. Verified businesses in your district read the request and reply with their availability and an estimate.
  3. Compare the replies, check profiles and reviews, and choose — no obligation.

Post a job for free

Frequently asked questions

How much does bathroom renovation cost in Cyprus?

As a rough guide, prices start at about €3,500 and go up to €12,000 per bathroom. The real price depends on size, materials and the starting condition: businesses tell you after reading your request.

Does asking for a quote cost anything?

No: posting a job is free and does not commit you to anything. You decide whether, and to whom, to give the job.

Who replies to my request?

Only businesses and tradespeople working in your district that we have checked before activating them on Handy360.

Which areas do you cover?

All of Cyprus: Nicosia, Limassol, Larnaca, Paphos and Famagusta districts.

Redoing a bathroom almost always means removing the old tiles, checking the drains and plumbing, waterproofing, laying new floor and wall tiles, and fitting sanitaryware and taps.

Two things move the price the most: replacing a bath with a shower tray (which touches the drains) and moving the toilet or basin from where they are today. A standard bathroom usually takes two to three weeks of work; if it is the only bathroom in the house, agree in advance how you will manage those days. Removing the rubble and touching up the paintwork are normally part of the job.

In your request, give the size in square metres, whether you want a shower instead of the bath, whether the fittings stay where they are, and whether you have already chosen tiles and sanitaryware or want the business to suggest them.

Dove

© 2026 Handy360 · Made by Ariall